AT celebrates the opening of Johnstons of Elgin’s new production facility

Team AT at Johnstons of Elgin, Hawick division.

Alasdair and Fraser from the AT team were delighted to join Johnstons of Elgin for the official opening of their new 950m² production facility – a project that’s been close to our hearts and one we’re proud to have designed.

It was a pleasure to catch up with the wider project team and see the building come to life, now being used by the people it was designed for. A key part of the brief was to link the historic 1882 B-listed mill with a new, modern extension – transforming a former car park into a welcoming entrance and significantly enhancing the visitor experience.

As part of the £1.6m project, natural sandstone was used to bridge old and new, anchoring the extension to its historic context. The contemporary elements – including sleek insulated metal cladding, cantilevered canopies, and sharp detailing – reflect the evolving direction of the site. This contrast is continued in the new building’s basecourse of natural sandstone and finished with powder-coated cappings at the head of the façade walls on either side.

Johnstons of Elgin has been one of our long-standing clients, and it’s been a real privilege to support them across multiple projects over the years. This latest addition marks another exciting chapter in their story – and we’re proud to have played a part in it.

“I was incredibly proud to contribute to such a meaningful local project and to witness firsthand the positive impact the completed extension had on both the company and its employees.”

Fraser Hunter

Senior Architectural Technician

A huge well done to everyone involved in making this project a reality!

Watch the full video to learn more about this collaboration: https://youtu.be/jDheBOOWIMI